Bollington put-in
This slipway launches onto the Macclesfield Canal on the edge of Bollington, near Clarence Mill and on the Cheshire Ring cruising route. The canal crosses the Bollington valley on two aqueducts and an embankment as it threads through the town.
No locks through Bollington
Construction of the Macclesfield Canal began here at Bollington on 4 December 1826, engineered by William Crosley to Thomas Telford's survey. Rather than following the land's contours, the canal was built by cutting and filling to keep as straight a course as possible; it has no locks at Bollington, its only flight — twelve locks at Bosley — several miles to the south.
A short paddle north the canal crosses Grimshaw Lane on a Grade II listed stone aqueduct, built around 1830 in hammer-dressed sandstone. This stretch forms part of the 97-mile Cheshire Ring cruising route, so paddlers share the water with narrowboat traffic.
Nearby
Independent cafe inside Clarence Mill on the canal, about 1.4 km (0.9 miles) north of this launch.
WebsiteConditions to check
Questions
No questions yet
Ask about parking, access or conditions. Anyone who knows this water can answer.
Comments
No comments yet.
Save your own spots
Keep the places you launch, check the wind and shelter before you go, and log every paddle. Add a spot to the directory too, and other paddlers will find it. Free to start.